Part of the footbridge, dubbed the “wobbly bridge” when it first opened has started to degrade.
The Millennium Bridge across the River Thames is to shut for three weeks for urgent maintenance work.
A replacement of the synthetic membrane which separates the bridge’s steel structure from its aluminium bridge deck is needed. “Replacing this layer is a time-consuming process, meaning we have no option but to close the bridge for three weeks and to work round the clock to get it done as quickly as possible.
Deutschland Neuesten Nachrichten, Deutschland Schlagzeilen
Similar News:Sie können auch ähnliche Nachrichten wie diese lesen, die wir aus anderen Nachrichtenquellen gesammelt haben.
'Wobbly' Millennium Bridge closed for weeks for 'urgent repair work' as part of structure is 'degrading'London's Millennium Bridge is closing for three weeks while maintenance workers carry out urgent repairs.
Weiterlesen »
Millennium Bridge: 'Wobbly' pedestrian crossing to close for repairsParts of the central London pedestrian crossing are beginning to degrade and need replacing.
Weiterlesen »
London’s Best Sunday Roasts | The Best Roast Dinners in LondonThe restaurants and pubs in London that serve the finest versions of Britain’s most iconic meal — a Sunday roast with roast beef, roast chicken, potatoes, gravy, the works
Weiterlesen »
Plans unveiled for £800,000,000 Las Vegas-style sphere in part of London'The fact that where we are now, on the permission being granted, is a travesty of justice.'
Weiterlesen »